Home › Subcontractor Compliance Map
Subcontractor Compliance by State
For contractors in their first years. Just opened your company, or taking work in a new state? Select a state to see the rules that trip up new subcontractors: license, license threshold, preliminary notice, lien deadline, prompt pay, private and public retainage, and workers' compensation. Each answer shows its source and how it was verified.
This information is operational guidance, not legal advice. Statutes change and have exceptions. Confirm deadlines with the state agency or an attorney before relying on them for a specific project.
Select a state
Click a state on the map or pick one from the list below.
All 50 states
- Alabama
- Alaska
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- Florida
- Georgia
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Federal rules that apply in every state
| Rule | Citation | Evidence | Source |
|---|---|---|---|
| Employers with more than 10 employees at any time in prior year must keep 300 log; Form 300A posted Feb 1 to Apr 30. Employers with 10 or fewer employees are exempt from routine recordkeeping (still must report severe events). Partially exempt industries are listed in 1904.2 Appendix A; check whether your industry is on that list. 300A must be certified by a company executive. | 29 CFR 1904.1; 29 CFR 1904.32 | Official source | source |
| Being verified. Whether OSHA 10/30-hour cards are required federally, or by states such as NY or NV, is being verified. Confirm with OSHA. | Being verified | source | |
| Written hazard communication program required at each workplace; fall protection training with written certification required. 1926.59 adopts 1910.1200 for construction; 1910.1200(e)(1) requires written program, (h) requires training. 1926.503 requires competent-person training and written certification (name, dates, trainer signature); retrain when needed. | 29 CFR 1910.1200(e),(h); 29 CFR 1926.59; 29 CFR 1926.503 | Official source | source |
| Form I-9 required for every new hire; Section 2 within 3 business days of start. Hires lasting under 3 business days must be completed at time of hire. Retention: 3 years after hire or 1 year after employment ends, whichever is later. Source is the Cornell LII copy of 8 CFR 274a.2; confirm with USCIS. | 8 CFR 274a.2 | Secondary source, verify before relying | source |
| FAR 52.222-54 flows to subcontracts over $3,500 for construction/services performed in the US. The subcontract threshold is set in paragraph (e) of the clause. For the prime contract threshold, see FAR 22.1803. | FAR 52.222-54(e) | Official source | source |
| Applies to federal/federally assisted construction contracts over $2,000. The $2,000 threshold is stated on the DOL page. For weekly certified payroll rules (Form WH-347), confirm with the DOL Wage and Hour Division. | Davis-Bacon and Related Acts (DOL WHD) | Official source | source |
| Bonds required for federal construction contracts over $150,000; 90-day notice for second tier; suit within 1 year. Bond threshold per FAR 28.102-1 on acquisition.gov. The 90-day notice (from last labor or material, for subs with no contract with the prime) and one-year suit period come from the Cornell LII copy of 40 USC 3133; confirm against the official U.S. Code. | FAR 28.102-1; 40 U.S.C. 3133 | Secondary source, verify before relying | source |
| Prime must pay subs within 7 days of receiving payment from the government, plus interest penalty if late. Interest runs from day after due date until paid, at the Treasury rate under 41 USC 7109. Government is not liable for the interest. | FAR 52.232-27(c)(1)-(2), (k) | Official source | source |
| Threshold is $2,000 for payments made after 2025 (up from $600); file by January 31. IRS instructions state NEC of $2,000 or more applies to tax years beginning after 2025, indexed for inflation from 2027. Form 1099-NEC due January 31 to IRS and recipients. | IRS Instructions for Forms 1099-MISC and 1099-NEC, Box 1a | Official source | source |
| Collect Form W-9 from payees; backup withholding is a flat 24% if TIN not provided. Payee must give TIN, certified under penalties of perjury for certain payments. Other triggers include IRS notice of incorrect TIN. | IRS Topic No. 307 | Official source | source |
| Form 941 filed quarterly (Apr 30, Jul 31, Oct 31, Jan 31); Form 940 annually by Jan 31. 10 extra days if all taxes deposited on time. Weekend/holiday due dates move to next business day. For deposit schedules, confirm with the IRS. | IRS Employment Tax Due Dates | Official source | source |
| Non-exempt employees get at least 1.5x regular rate for hours over 40 in a workweek. Workweek is a fixed recurring 168 hours; hours cannot be averaged across weeks. No federal daily or weekend/holiday overtime rule by itself. | FLSA; DOL WHD Overtime | Official source | source |
| SAM.gov registration required to bid directly as prime on federal awards; UEI assigned at registration. Not needed for indirect awards. Sub-awardees may need only a UEI. Confirm subcontractor requirements with SAM.gov. | SAM.gov Entity Registration | Official source | source |
| EEO Know Your Rights poster required for covered employers; FLSA minimum wage poster via DOL. EEOC says materials are under revision per Executive Order; check the dated version. The WHD page lists the FLSA poster. For the OSHA 'It's the Law' poster, confirm with OSHA. | EEOC EEO Law Poster; DOL WHD Posters | Official source | source |
| Report fatality within 8 hours; inpatient hospitalization, amputation, or eye loss within 24 hours. Deaths reportable only if within 30 days of the incident; hospitalizations/amputations/eye loss only if within 24 hours of incident. Clock starts when employer learns of event. | 29 CFR 1904.39 | Official source | source |
| Keep payroll records at least 3 years; wage-computation records (time cards, rate tables) 2 years. Per DOL Fact Sheet 21, which cites 29 CFR 516.5 and 516.6; confirm on eCFR. | 29 CFR 516.5, 516.6; DOL Fact Sheet #21 | Official source | source |
| Retain I-9 3 years after hire or 1 year after employment ends, whichever is later. Source is the Cornell LII copy of 8 CFR 274a.2(b)(2); confirm with USCIS. | 8 CFR 274a.2(b)(2) | Secondary source, verify before relying | source |
Subcontractor back-office compliance checklist
45 items every specialty subcontractor should have, when each is needed, and what happens without it.
Business Setup 7 items
| ID | Item | Applies to | When needed | Importance | If missing | Rule / citation |
|---|---|---|---|---|---|---|
| A01 | Entity registration and annual report (good standing) with Secretary of State | All subs | Before bidding; renew every year on the state's annual report date | Critical | Entity can be administratively dissolved; liability shield, contracts, and license qualification can be challenged | Industry practice |
| A02 | Foreign qualification (registration to do business) in every other state you work in | Subs working outside their home state | Before performing work in the new state | High | Penalties and, in many states, no access to that state's courts to collect until registered | Industry practice |
| A03 | EIN plus state withholding and unemployment tax accounts | All employers | Before the first payroll | Critical | Late registration and deposit penalties; payroll cannot run legally | Industry practice |
| A04 | State contractor license or registration | Subs in licensing states | Before bidding or performing work above the state threshold | Critical | Fines, stop-work orders; in many states loss of the right to sue for payment or file a lien | Varies by state: see State Matrix |
| A05 | Trade licenses and license qualifier (electrical, plumbing, HVAC, fire protection) | Licensed trades | Before work; keep qualifier employed and license renewed | Critical | Permits denied, work rejected at inspection, license board discipline | Industry practice |
| A06 | Local business license or city/county contractor registration | All subs | Before pulling permits or starting work in that jurisdiction; renew annually | High | Permit denial, fines, delayed start | Industry practice |
| A07 | License or contractor bond | Where state or city requires it | Before the license issues; keep active | High | License not issued or suspended | Industry practice |
Insurance 5 items
| ID | Item | Applies to | When needed | Importance | If missing | Rule / citation |
|---|---|---|---|---|---|---|
| B01 | Commercial general liability with additional insured, primary/non-contributory, and waiver of subrogation endorsements | All subs | Before mobilization; at every renewal | Critical | GC will not let you start or will hold payment; uninsured claims fall on the company | Industry practice |
| B02 | Workers compensation coverage | Employers above the state threshold | Before the first employee works on site | Critical | Stop-work orders, state penalties, personal liability for injuries | Varies by state: see State Matrix |
| B03 | Commercial auto and umbrella/excess at subcontract limits | All subs | Before mobilization; at renewal | High | Breach of subcontract; GC can back-charge or terminate | Industry practice |
| B04 | Certificates of insurance collected from your own lower-tier subs and vendors | Subs who hire subs | Before they start; at each renewal | Critical | Insurer premium audit can charge you for uninsured lower-tier labor; uncovered claims | Industry practice |
| B05 | Surety relationship and bonding capacity (performance and payment bonds) | Subs bidding bonded work | Before bidding bonded jobs; annual financial review with surety | High | Cannot bid public or large private bonded work | Industry practice |
Contracts and Billing 10 items
| ID | Item | Applies to | When needed | Importance | If missing | Rule / citation |
|---|---|---|---|---|---|---|
| C01 | Subcontract review: pay-if-paid/pay-when-paid, indemnity, retainage, flow-down, notice clauses | All subs | Before signing every subcontract | Critical | Unpaid work, unlimited indemnity, missed notice deadlines that waive claims | Industry practice |
| C02 | Approved schedule of values | All subs | Before the first pay application | High | First pay app rejected or delayed | Industry practice |
| C03 | Monthly pay application package (G702/G703 or GC format) by the GC cutoff date | All subs | Every billing cycle, before the GC's cutoff | Critical | Missing the cutoff pushes payment a full cycle (30+ days) | Industry practice |
| C04 | Lien waivers: conditional with each pay app, unconditional on receipt of funds (statutory forms where required) | All subs | Every payment | Critical | Wrong form can waive rights to unpaid amounts; missing waivers hold payment | Industry practice |
| C05 | Preliminary notice / notice to owner | Subs on private projects | At start of work, within the state deadline | Critical | Lien rights lost or limited for the whole job | Varies by state: see State Matrix |
| C06 | Mechanics lien deadline calendar per job | Subs on private projects | Track from first furnishing; act before the state deadline | Critical | Missed deadline eliminates lien security for unpaid work | Varies by state: see State Matrix |
| C07 | Retainage tracking and release request | All subs | Every pay app; formal request at substantial completion | High | Cash held for months or years after the job ends | Varies by state: see State Matrix |
| C08 | Prompt payment rights and interest claims | All subs | As soon as a payment is late | High | Interest and statutory remedies left uncollected | Varies by state: see State Matrix |
| C09 | Signed change orders or T&M tickets before extra work | All subs | Before every change | Critical | Extra work goes unpaid; disputes at closeout | Industry practice |
| C10 | Contract notices (delay, claim, differing conditions) sent within contract deadlines | All subs | Within the notice window in the subcontract | High | Claims and time extensions waived | Industry practice |
Payroll and Labor 8 items
| ID | Item | Applies to | When needed | Importance | If missing | Rule / citation |
|---|---|---|---|---|---|---|
| D01 | Form I-9 for every new hire | All employers | Section 2 within 3 business days of start; keep on file | Critical | Federal fines per form | 8 CFR 274a.2 (Form I-9 required for every new hire; Section 2 within 3 business days of start.) Secondary source, verify before relying |
| D02 | E-Verify | Federal contractors above FAR thresholds; some states mandate | When the contract or state requires it | High | Contract breach, loss of federal work | FAR 52.222-54(e) (FAR 52.222-54 flows to subcontracts over $3,500 for construction/services performed in the US.) Official source |
| D03 | Payroll tax filings: Form 941 quarterly, Form 940 annually, plus state filings | All employers | Quarterly and annually | Critical | IRS penalties and interest; trust fund recovery penalty can reach owners personally | IRS Employment Tax Due Dates (Form 941 filed quarterly (Apr 30, Jul 31, Oct 31, Jan 31); Form 940 annually by Jan 31.) Official source |
| D04 | Overtime compliance (FLSA) | Non-exempt employees | Every payroll | Critical | Back wages, liquidated damages, wage claims | FLSA; DOL WHD Overtime (Non-exempt employees get at least 1.5x regular rate for hours over 40 in a workweek.) Official source |
| D05 | Worker classification review (W-2 employee vs 1099 contractor) | All subs | Before engaging any worker | Critical | Back payroll taxes, workers comp exposure, penalties | Industry practice |
| D06 | Certified payroll and prevailing wage | Federal Davis-Bacon jobs and state prevailing wage jobs | Weekly on covered projects | Critical | Payments withheld, back wages, possible debarment | Davis-Bacon and Related Acts (DOL WHD) (Applies to federal/federally assisted construction contracts over $2,000.) Official source |
| D07 | W-9 before first payment to any vendor or sub; 1099-NEC filing | All subs paying non-employees | W-9 before first payment; 1099-NEC by Jan 31 | High | Backup withholding liability and information-return penalties | IRS Instructions for Forms 1099-MISC and 1099-NEC, Box 1a (Threshold is $2,000 for payments made after 2025 (up from $600); file by January 31.); IRS Topic No. 307 (Collect Form W-9 from payees; backup withholding is a flat 24% if TIN not provided.) Official source |
| D08 | Required federal and state workplace posters | All employers | Posted at all times at office and where required on site | Medium | Fines; weakens defense in wage or discrimination claims | EEOC EEO Law Poster; DOL WHD Posters (EEO Know Your Rights poster required for covered employers; FLSA minimum wage poster via DOL.) Official source |
Safety 6 items
| ID | Item | Applies to | When needed | Importance | If missing | Rule / citation |
|---|---|---|---|---|---|---|
| E01 | Written Hazard Communication program and written safety program | All employers | Before work starts; update when hazards change | Critical | OSHA citations; fails GC prequalification | 29 CFR 1910.1200(e),(h); 29 CFR 1926.59; 29 CFR 1926.503 (Written hazard communication program required at each workplace; fall protection training with written certification required.) Official source |
| E02 | OSHA 300 log and 300A annual summary | Employers above the federal size threshold | Record within 7 days of a case; post 300A Feb 1 to Apr 30 | High | OSHA recordkeeping citations | 29 CFR 1904.1; 29 CFR 1904.32 (Employers with more than 10 employees at any time in prior year must keep 300 log; Form 300A posted Feb 1 to Apr 30.) Official source |
| E03 | Severe injury and fatality reporting to OSHA | All employers | Fatality within 8 hours; hospitalization, amputation, or eye loss within 24 hours | Critical | OSHA citations and penalties | 29 CFR 1904.39 (Report fatality within 8 hours; inpatient hospitalization, amputation, or eye loss within 24 hours.) Official source |
| E04 | Training records: fall protection, OSHA 10/30 where required by state or project | All employers | Before workers go on site; refresh per program | High | Workers barred from site; citations | Being verified |
| E05 | Experience Modification Rate (EMR) letter from insurer | All subs | Every GC prequalification; updated annually | High | Disqualified from GC bid lists when EMR is high or missing | Industry practice |
| E06 | Site-specific safety plan and job hazard analysis | All subs | Before each project mobilizes | High | GC refuses mobilization; higher incident risk | Industry practice |
Financial Controls 6 items
| ID | Item | Applies to | When needed | Importance | If missing | Rule / citation |
|---|---|---|---|---|---|---|
| F01 | Job costing by cost code, reviewed weekly | All subs | Weekly | High | Losses found too late to correct | Industry practice |
| F02 | Monthly WIP schedule (over/under billing) | All subs; required by most sureties and banks | Monthly | High | Cash surprises; surety and bank credit reduced | Industry practice |
| F03 | Sales and use tax treatment of materials per state | Subs buying and installing materials | At bid and purchase, per job state | High | Tax assessments on audit | Industry practice |
| F04 | Record retention: payroll, I-9, tax, job files | All employers | Ongoing | Medium | Cannot defend audits, wage claims, or warranty disputes | 29 CFR 516.5, 516.6; DOL Fact Sheet #21 (Keep payroll records at least 3 years; wage-computation records (time cards, rate tables) 2 years.); 8 CFR 274a.2(b)(2) (Retain I-9 3 years after hire or 1 year after employment ends, whichever is later.) Secondary source, verify before relying |
| F05 | Prequalification packet: financials, EMR, licenses, COI, references | All subs | Before bidding a new GC; update annually | High | Cannot get on bid lists | Industry practice |
| F06 | Closeout package: warranties, O&M manuals, as-builts, final lien waiver, retainage release request | All subs | At completion | High | Final payment and retainage withheld | Industry practice |
Federal Projects 3 items
| ID | Item | Applies to | When needed | Importance | If missing | Rule / citation |
|---|---|---|---|---|---|---|
| G01 | SAM.gov registration | Subs bidding federal prime contracts | Before award | Medium | Cannot receive a federal prime award | SAM.gov Entity Registration (SAM.gov registration required to bid directly as prime on federal awards; UEI assigned at registration.) Official source |
| G02 | Miller Act payment bond claim notice and suit deadlines | Subs on federal projects | Track from last day of work | Critical | Bond claim rights lost on federal jobs | FAR 28.102-1; 40 U.S.C. 3133 (Bonds required for federal construction contracts over $150,000; 90-day notice for second tier; suit within 1 year.) Secondary source, verify before relying |
| G03 | Federal prompt payment (prime to sub) | Subs on federal projects | Each payment cycle | High | Interest left uncollected | FAR 52.232-27(c)(1)-(2), (k) (Prime must pay subs within 7 days of receiving payment from the government, plus interest penalty if late.) Official source |
Still being verified
- Federal: whether OSHA 10/30 is federally mandated for private construction, and which states mandate it
- Federal: construction status on OSHA 1904 partial-exemption list (Appendix A to Subpart B)
- Federal: E-Verify prime contract threshold (FAR 22.1803) and Davis-Bacon weekly certified payroll form
- Federal: EEOC 'Know Your Rights' poster is under revision per the EEOC site
- State sales and use tax treatment of contractor materials (checklist item F03) not researched per state
- I-9, I-9 retention, and Miller Act deadlines read from Cornell LII copies, not the agency pages
- AL: licensing exemptions in Ala. Code 34-8-7 changed effective Oct 1, 2026; $50,000 commercial threshold may be outdated
- CA: private retainage 5% cap for contracts from Jan 1, 2026 is from one secondary source with an inconsistent statute cite
- GA: preliminary notice timing (from Notice of Commencement vs first furnishing) inconsistent in source
- KS: workers comp threshold conflict ($20,000 payroll vs 1+ employees)
- MA: prompt pay timelines conflict between sources
- MO: whether subs must give 10-day notice to owner before filing a lien
- MS: 2024 private retainage cap (5%) vs older source saying no cap
- NM: retainage reported as prohibited on private and public work; workers comp construction threshold
- SD: workers comp, official page says no mandate; secondary sources say 1+ employees
- WA: preliminary notice exemption for subs contracting directly with the prime (RCW 60.04.031) vs secondary sources
- UT: fire suppression licensing agency (State Fire Marshal vs DOPL) and current license threshold
- Lien deadlines, prelim notices, retainage, and prompt pay in most states rest on secondary sources
- CT: License Threshold
- MD: License Threshold
- MA: License Threshold
- MT: License Threshold
- NH: License Threshold
- NJ: License Threshold
- NM: License Threshold